Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

DOT Bid Tabulations and Unit Prices, Searchable

Highway pay-item unit prices and letting results from official state DOT sources: 1,048,656 TxDOT bid rows and FDOT's published item averages. Every number shows its source and retrieval date, and every extension is checked: Qty × Unit Price = Total.

Official TxDOT bid rows
1,048,656
data.texas.gov, Nov 2, 2024–Nov 19, 2026
TxDOT proposals tabulated
4,196
446 contractors with 5+ bids
FDOT pay items averaged
2,084
FDOT report run Nov 23, 2026
Bid totals re-added
286/286
Σ Qty × Unit Price = published bid total

Last data refresh: TxDOT Nov 24, 2026 · FDOT Nov 23, 2026 · Caltrans not yet ingested (official links on the Caltrans hub).

Featured pay-item intelligence ledger

Full item page →

TxDOT 341-7050 · D-GR HMA TY-D SAC-B PG70-22 · Unit: TON

Low bid
$105.60/TON
Quantity-weighted median of winning unit prices
Weighted median
$125.00/TON
Quantity-weighted median of every bid
Engineer’s estimate
$110.00/TON
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
+7.52%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$100.00$200.00$300.00$400.00101001K10K100KQuantity (TON), log scaleUnit price ($/TON)
Winning (low) bid Other bid Fitted price curve (ln price = 6.17 − 0.144·ln qty, R² 0.52)320 plotted bids, 4 above the chart range

Source: TxDOT bid tabulations, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Statistics are computed by us; see the methodology.

Contractor head-to-head · Money left on the table

Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District

Line quantity 9,727 TON · Engineer’s estimate $119.62/TON

  • 1. Lone Star Paving Company

    LOW BID · WINNER
    Unit price
    $127.00/TON
    Extension
    $1,235,329.00
    Proposal total
    $6,732,215
    Money left on the table
    $1,063,968 (15.8%)
    vs. engineer’s estimate
    +6.2%
  • Unit price
    $131.50/TON
    Extension
    $1,279,100.50
    Proposal total
    $7,796,183
    vs. low bid
    +$1,063,968
    vs. engineer’s estimate
    +9.9%
  • Unit price
    $140.00/TON
    Extension
    $1,361,780.00
    Proposal total
    $7,966,171
    vs. low bid
    +$1,233,956
    vs. engineer’s estimate
    +17%
  • Unit price
    $140.00/TON
    Extension
    $1,361,780.00
    Proposal total
    $8,000,580
    vs. low bid
    +$1,268,365
    vs. engineer’s estimate
    +17%
  • 5. Nobles Road Construction, Inc.

    Unit price
    $149.00/TON
    Extension
    $1,449,323.00
    Proposal total
    $8,307,427
    vs. low bid
    +$1,575,212
    vs. engineer’s estimate
    +24.6%
  • Unit price
    $138.00/TON
    Extension
    $1,342,326.00
    Proposal total
    $8,389,000
    vs. low bid
    +$1,656,785
    vs. engineer’s estimate
    +15.4%
  • Unit price
    $161.04/TON
    Extension
    $1,566,436.08
    Proposal total
    $8,534,153
    vs. low bid
    +$1,801,938
    vs. engineer’s estimate
    +34.6%
  • Unit price
    $155.00/TON
    Extension
    $1,507,685.00
    Proposal total
    $8,617,318
    vs. low bid
    +$1,885,103
    vs. engineer’s estimate
    +29.6%
  • Unit price
    $156.00/TON
    Extension
    $1,517,412.00
    Proposal total
    $9,257,856
    vs. low bid
    +$2,525,641
    vs. engineer’s estimate
    +30.4%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Coverage by state

What you can do

Benchmark your own bid-tab CSV or PDF

Compare your unit prices and extensions with TxDOT and FDOT bid history.

Drag & drop a CSV or PDF bid tab, orCHOOSE FILE

.csv, .tsv, .txt or text-based .pdf · processed in memory for your benchmark only, never stored

$0 Free Explorer

  • Search pay items and view bid tabulations
  • Low bid, weighted median and engineer's estimate
  • 12-month price trend
  • CSV export of item bid rows
MOST POPULAR

$69/mo Single-State Pro

  • Everything in Free Explorer
  • Full pay-item intelligence: charts, spreads, trends
  • Upload and benchmark your bid tab (CSV or PDF)
  • Unlimited exports

$149/mo Multi-State Team

  • Everything in Single-State Pro
  • All three states: TxDOT, Caltrans and FDOT
  • Team access for up to 10 users
  • Priority data updates and new pay items

Annual billing: 2 months free · $690/yr Single-State Pro, $1,490/yr Multi-State Team.

How we source data

Official open .gov feeds only: the TxDOT bid tabulation dataset published on data.texas.gov and FDOT's Historical Item Average Cost reports. We do not scrape commercial bid services, plan rooms or login-gated portals. Each page states its source file, retrieval date and a hash of what we read. Read the full methodology.

Frequently asked questions

What is a DOT bid tabulation?

A bid tabulation (bid tab) is the agency's published record of a highway letting: every bidder on a proposal, the unit price each bidder entered for every pay item, the extended amounts and the bid totals, usually next to the engineer's estimate. This site covers state DOT highway lettings, not subcontractor bid-leveling sheets.

Where does the data come from?

Only from official agency publications: the TxDOT bid tabulation dataset on data.texas.gov and FDOT's Historical Item Average Cost reports on fdot.gov. Caltrans data are linked from its own pages until its feed is ingested. No commercial bid service is scraped.

How current is it?

TxDOT figures were refreshed from the open-data API on the date shown in the coverage block; the live search queries the TxDOT API directly. FDOT figures follow FDOT's own report run date.

Are these TxDOT's or FDOT's official averages?

No. Unit-price statistics are computed by us from the agencies' published bids and reports, and each page links to the original file. Agency files contain errors and revisions; treat every figure as 'as published by the agency'.

What does 'money left on the table' mean?

The difference between the winning low bid and the second-lowest bid on the same proposal. It is a standard bid-analysis measure of how close the competition was, not a judgment of any bidder.

Latest lettings: 6508-67-001 (El Paso County, low bid Hall Brothers, Inc.) · 6509-66-001 (Dimmit County, low bid Boen Landscaping & Irrigation, LLC) · 6510-23-001 (Lamar County, low bid Austin Barricade Company, L.L.C.).